Full House Renovations | Transform Your Home
Whole-House RenovationsManaged Like Commercial Projects
Working towards
ISO 9001
Standards
Renovations We Specialise In
Buy-to-Renovate Projects
Occupied Home Renovations
Heritage & Listed Building Restoration
Post-Purchase Refreshes
What's Included in a Full Renovation
Structural Work
• Load-bearing wall removal (with steel installation)
• Roof repairs and replacement
• Floor joist strengthening
• Damp-proofing and tanking
Mechanical & Electrical
• Full rewire to 18th Edition standards
• New consumer unit with RCD protection
• Complete replumb in copper or plastic
• New central heating system (boiler, radiators, controls)
Kitchens & Bathrooms
• Full design service or installation of your supplied units
• Appliance installation and connection
• Tiling, flooring, and finishing
Interior Finishing
• Plastering (skim or full re-plaster)
• Internal doors and architraves
• Skirting boards and coving
• Full decoration to your specification
External Work
• Roofing and chimney repairs
• Rendering and exterior decoration
• Window and door replacement
• Driveway and landscaping
Used and loved by people at leading companies
How We Keep Renovations On Track
Crown’s ISO 9001 Scheduling Eliminates This Chaos
Every trade is scheduled before work begins. We know exactly who’s on site each week.
Our site manager ensures each trade completes their work ready for the next team.
Documented inspections at each stage mean issues are caught immediately, not during decoration.
Realistic timelines account for normal construction variables. We don’t quote optimistic timelines then make excuses.
You speak to one person who knows everything about your project—no chasing multiple trades.
FAQ Questions
Frequently Asked Questions
Full renovations typically cost £800-£1,500 per square metre depending on specification and
property condition. A 100sqm 3-bed semi might range from £80,000 (standard spec) to
£150,000 (high spec with structural work). We provide detailed breakdowns so you know
exactly where your budget goes.
Typical full renovations take 12-20 weeks depending on property size and scope. We provide
realistic timelines during our assessment and keep you updated on progress throughout. Our
completion rate within quoted timelines is 94%.
For full renovations, we strongly recommend it. Living in a building site is stressful, and
giving us clear access speeds completion. However, if you need to stay, we can design a
phased approach that maintains liveable areas.
Most internal renovations don't require planning permission. However, if you're in a Listed
building or conservation area, or making external changes, permissions may be needed. We'll
advise during our assessment and handle applications if required.
Absolutely. We're happy to quote from existing architectural drawings and work alongside
your design team. Alternatively, we can recommend architects we've successfully
collaborated with.
